What’s in the box
Bill of materials.
6 curated parts. One delivered box. Each item picked and double-checked against the build spec.
#PartQtyList price
02×1$2013.61
05×1$283.80
Total parts list$4,230.49Pack price$4,230.49
Install schedule
Order to
signed-off.
The standard timeline for fitting this pack. Workshop time depends on platform and prep state — confirm with your shop.
01
Day 0 — Order
Place the pack. We pick + dispatch the parts within 24 hours.
02
Day 1–3 — Delivery
Express AU-wide. Tracking on every pack as soon as it scans.
03
Day 4–6 — Install
Estimated 12–16 workshop hours depending on platform and tooling.
04
Day 7 — Dyno + tune
Tune file matched to the pack. Power figures verified before sign-off.
Other Power Packs



